Bathroom Renovation - A Step by Step Guide

Bathrooms are one of the smallest rooms in theaccount so the pipe is in the correct position when
house and they are also one the most costly tothe toilet is installed after tiling. Also rough in the any
renovate. Bathroom renovation is a job that, if donenew electrical wires without connecting them to the
well, can add value to a home and a great space fullmains power.
of design and light.Step two - Install wall and ceiling linings
Bathroom designInstall your 6mm wall lining being careful to nail the
Bathroom design is the first area of your bathroomfibro board every 150mm without nailing into the new
renovation you need to get right. Just replacing thepipes and electrical wires. The best way is to
existing bathroom with the same design may not bemeasure and mark the pipe and wire layout onto
enough. The key to great bathroom design is toyour new wall board with a pencil as you go. Screw
design it with the people that are going to use it inup (or nail) the ceiling lining, plasterboard is the most
mind. However be sure that your bathroom designcommon. However if you are laying your tiles from
also has a general use factor as well. For example: Iffloor to ceiling do not install the cornice as this is best
you were designing a bathroom for families you coulddone after tiling. If you are not tiling to the ceiling go
still design the bathroom with easy access to theahead and install the cornice after the wallboard and
shower and bath. This would ensure that the designceiling lining have been installed. Also if your bath is
would also work for people with limited mobility. Thisnot freestanding you can now make up the frame
means if you decide to sell your home or if you areand install the bath. Ensure the bath is installed
renovating for profit your design has a wider marketcorrectly allowing for the thickness of the tiles and
appeal. Great bathroom design also uses the spaceglue.Be sure to check all linings and pipes before you
well, taking into account the light or window space,continue with your bathroom renovation.
size of fittings, and drainage options. Draw out a planStep three - Waterproof your bathroom
to scale and right down the sizes of your room. MarkWaterproof your bathroom floor, shower recess, and
the existing drainage points and then and water inletaround the bath. When waterproofing the floor
points. Write down a wish list of the bathroomensure that the waterproofing comes 100mm up the
fittings to need and want with their sizes. Now marrywalls. The shower recess will need to be
the two together and see what fits. Note: Mostwaterproofed 100mm above the shower rose outlet.
bathroom drainage and water inlet points can beAlso the bath should be waterproofed 100mm above
moved but this does come at extra cost.the lip of the bath right around and to the floor. At
Bathroom remodelthe doorway install a 25 x 25mm aluminum angle
If you have decided to do the work yourself or partglued into place with quality silicone and waterproof
of the work it is time to hire a skip bin and pull outinto the lip. Your whole bathroom should now the
the old bathroom. If your home was made pre 1980tanked, so the all water will only go down a drain.
you may have fibro bathroom wall linings withBathroom waterproofing tip: waterproofing is an easy
asbestos in it and great care will need to be taken.job but quality and accuracy is most important.
You will need some full body disposable overalls, eyeStep four - Lay in the cement screed for the floor.
protection, and quality dust mask. Check with yourBefore the floor tiles can laid the floor must be
local building authority or council regarding thesmooth and fairly flat with a slight fall to the drainage
regulation on bathroom asbestos wall lining removal.outlet. To do this you must use sand and cement
Remove everything except the plumbing. If youmix and it is best to add a waterproofing agent into
keep the bathroom plumbing in place you will notthis as well. With a level, set the floor level at the
have to turn the water off for the whole house. Alsodoorway. Use the top aluminum angle as the finished
you will need to jack hammer the floor tiles up andfloor level and measure down the thickness of the
the sand and cement bed that they are laid on.tile plus 10mm for the glue. Mark right around the
Bathroom Renovation and constructionbathroom with a level and then screed in your sand
Bathrooms must be construction properly from theand cement mix with a 1 to 3 degree fall to the top
ground up to ensure that the finished job is correctof the drain outlet. Take your time and get it right
and true. This also ensures the design and look of thewith the finished level as smooth as possible. When
bathroom will have a great finishthe sand cement mix has set but is not dry (you can
The Bathroom Renovation Processwalk on it but you it is still a bit soft) rub it over with
a house brick. This will remove all the small highs and
1. Install water and drainage pipe and electrical wires.lows and check with a level as you go. Let the
2. Install wall lining and ceiling and then install the bathbathroom floor fully dry and then you should have a
hob and bath.great surface to tile onto. Tip: the more work you
3. Waterproof the floor and shower and bath recess.put into the floor screed the easier your tiling will be.
4. Correct the fall of the floor with sand and cementStep five: Tile floor and walls
ready for tiling.Lay your tiles on the floor first and then grout. Then
5. Lay floor and wall tiles and then grout.lay your wall tiles making sure that they are level as
6. Install new bathroom vanity, fittings, and taps -you lay. Once the bathroom tiles have been cut and
install new electrical.laid, grout all your tiles and then buff the tiles clean.
7. Paint ceiling and final clean.Step one - Plumbing andStep six: Install plumbing fitting and fixtures
electricalInstall all your plumbing fittings and taps. Also fit all
At this point all new plumbing is installed for clean hotyour towel rails and soap holders. Fit your new
and cold water and drainage. Careful attention needsbathroom vanity making sure it is level and sealed
to be taken when positioning the new plumbing soaround the top with silicone and also seal around the
that the plumbing fittings are correct when the tilingbath. Tip: make sure they are in the right place
is finished. For example: To centre a fitting in abefore you drill into your tiles.
shower recess you must take into consideration theStep seven: painting, and cleaning - enjoy
thickness of the wall board, tile glue and tile so thePaint your ceiling and do a final clean making sure
fitting will be centred after the tiles are in place. Theeverything is fitted correctly and that there are no
same applies to installing drainage pipes for a toilet;leaks in your plumbing. - Enjoy your new bathroom.
the wall lining and tile thickness must be taken into